CBAM cost reference › South Korea › Hydrogen

CBAM cost for South Korea Hydrogen in 2026

Importing hydrogen from South Korea under the EU Carbon Border Adjustment Mechanism? Here is what one representative shipment costs on the official EU default value — and how much verified supplier data saves. All figures are produced by our compliance engine at the current published certificate price of €82/t.

Hydrogen plant, animated
On EU default value
€86,199

2026 certificates to surrender (after free allocation)

Full exposure, 100% basis: €127,044

100 tonnes of hydrogen · 1,543 tCO₂e · includes 10.0% default mark-up

With verified supplier data
€74,650

2026 certificates to surrender (after free allocation)

Full exposure, 100% basis: €115,495

mark-up removed · verified actual emissions

Potential saving on one shipment in 2026
€11,549
13.4% lower on the 2026 certificates

Watch South Korea hydrogen emissions compute — live

Before you file, see exactly where a hydrogen plant's carbon comes from, by production route. This is the live Balance Twin, computing embedded emissions in your browser — no login, nothing to install.

See every hydrogen route in the full Hydrogen tour →

How the South Korea hydrogen number is built

Under EU Regulation 2023/956 and its implementing rules, embedded emissions for hydrogen are the specific embedded emissions (SEE) of the good multiplied by the mass imported. Where you cannot yet provide verified actual data, the EU default value applies — and for hydrogen that default carries a 10.0% mark-up in 2026 (Regulation (EU) 2025/2621). This worked example uses the default SEE of 15.433 tCO₂e per tonne; verified data on this example brings the effective SEE to 14.03 tCO₂e per tonne, which is what removes the mark-up cost.

Shipment100 tonnes of hydrogen from South Korea
Certificate price (2026)€82 / tCO₂e
Full exposure on default value (100% basis)€127,044
Full exposure with verified data€115,495
Saving on full exposure€11,550 (9.1%)
You surrender for 2026 (after free allocation adjustment)€86,199
… with verified data€74,650

Two figures, both correct. Full exposure is what this shipment costs once EU ETS free allocation has gone (2034 onward) — the number to plan against. You surrender for 2026 is the actual 2026 obligation: the embedded emissions minus the free allocation adjustment — the CBAM benchmark (5.089 tCO₂e/t) × 97.5% still allocated free to EU producers × tonnes (Art. 31, Reg (EU) 2023/956; Reg (EU) 2025/2620).

Illustrative single-product estimate. Verify with a full report before filing. The figures assume no Article 9 claim; a carbon price you can evidence as paid in the country of origin may reduce them.

Default values are a regulatory fallback, not a measurement of any specific plant. The EU default SEE is a conservative reporting value that applies until you provide verified actual data — a real South Korea hydrogen plant may emit more or less. That is exactly why verified supplier data usually lowers the number.

Last updated: 2026-10-25 · figures at €82/tCO₂e for CBAM year 2026, computed by our compliance engine.

Carbon price and Article 9 in South Korea

South Korea operates the K-ETS, so a carbon price already paid there may be creditable under Article 9 — keep the evidence of what was paid. Where a carbon price has been paid on these emissions, Article 9 of Regulation (EU) 2023/956 lets you deduct it from your CBAM liability — but only against evidence of the price actually paid, and it never turns a positive liability negative. This is separate from the default-value mark-up: verified emissions data removes the mark-up, while a verified carbon price paid in South Korea is what Article 9 credits.

Cut your South Korea hydrogen CBAM bill

Our self-hosted CBAM platform collects verified data from your South Korea suppliers, computes engine-certified emissions, and generates registry-ready QReport XML — so you claim the lower number defensibly.

Run the free cost check Book a 15-min demo

Frequently asked

How much does CBAM cost for South Korea hydrogen?

For 2026 you surrender about €86,199 on the default value for 100 tonnes — 1,543 tCO₂e embedded at €82/t, less the free allocation adjustment (benchmark 5.089 tCO₂e/t × 97.5% still free) while EU ETS free allocation is being phased out. Once it has gone the same shipment carries €127,044. Both include the 10.0% mark-up.

How much can verified supplier data save?

On this example, roughly €11,550 (9.1%) per shipment — removing the default mark-up brings the liability to €115,495.

When is CBAM payable on imports from South Korea?

Goods imported in 2026 become certificates bought from February 2027; the first annual declaration is due 30 September 2027.

Related: South Korea steel · South Korea aluminium · South Korea cement · South Korea fertiliser