CBAM cost reference › Bosnia and Herzegovina › Cement

CBAM cost for Bosnia and Herzegovina Cement in 2026

Importing cement from Bosnia and Herzegovina under the EU Carbon Border Adjustment Mechanism? Here is what one representative shipment costs on the official EU default value — and how much verified supplier data saves. All figures are produced by our compliance engine at the current published certificate price of €75/t.

On EU default value
€352,308

5,000 tonnes of Portland cement · 4,675 tCO₂e · includes 10.0% default mark-up

With verified supplier data
€320,280

mark-up removed · verified actual emissions

Potential saving on one shipment
€32,028
9.1% lower — every quarter you import it

Watch Bosnia and Herzegovina cement emissions compute — live

Before you file, see exactly where a cement plant's carbon comes from, by production route. This is the live Balance Twin, computing embedded emissions in your browser — no login, nothing to install.

See every cement route in the full Cement tour →

How the Bosnia and Herzegovina cement number is built

Under EU Regulation 2023/956 and its implementing rules, embedded emissions for cement are the specific embedded emissions (SEE) of the good multiplied by the mass imported. Where you cannot yet provide verified actual data, the EU default value applies — and for cement that default carries a 10.0% mark-up in 2026 (Regulation (EU) 2025/2621). This worked example uses the default SEE of 0.935 tCO₂e per tonne; verified data on this example brings the effective SEE to 0.85 tCO₂e per tonne, which is what removes the mark-up cost.

Shipment5,000 tonnes of cement from Bosnia and Herzegovina
Certificate price (2026)€75 / tCO₂e
Full exposure on default value (100% basis)€352,308
Full exposure with verified data€320,280
Saving on full exposure€32,028 (9.1%)
You surrender for 2026 (CBAM factor 2.5%)€8,808
… with verified data€8,007

Two figures, both correct. Full exposure is what this shipment costs once EU ETS free allocation has gone (2034 onward) — the number to plan against. You surrender for 2026 is the actual 2026 obligation: free allocation still covers most of it, so only 2.5% of embedded emissions is chargeable this year (Art. 31, Reg (EU) 2023/956).

Illustrative single-product estimate. Verify with a full report before filing. CBAM liability also reflects any carbon price already paid in the country of origin (Article 9).

Cut your Bosnia and Herzegovina cement CBAM bill

Our self-hosted CBAM platform collects verified data from your Bosnia and Herzegovina suppliers, computes engine-certified emissions, and generates registry-ready QReport XML — so you claim the lower number defensibly.

Run the free cost check Book a 15-min demo

Frequently asked

How much does CBAM cost for Bosnia and Herzegovina cement?

For 2026 you surrender about €8,808 on the default value for 5,000 tonnes — 4,675 tCO₂e embedded at €75/t, of which only 2.5% is chargeable while EU ETS free allocation is still being phased out. Once it has gone the same shipment carries €352,308. Both include the 10.0% mark-up.

How much can verified supplier data save?

On this example, roughly €32,028 (9.1%) per shipment — removing the default mark-up brings the liability to €320,280.

When is CBAM payable on imports from Bosnia and Herzegovina?

Goods imported in 2026 become certificates bought from February 2027; the first annual declaration is due 30 September 2027.

Related: Bosnia and Herzegovina steel · Bosnia and Herzegovina aluminium · Bosnia and Herzegovina fertiliser · Bosnia and Herzegovina hydrogen